We worked closely with the delivery team to ensure the construction methodology met and exceeded all design standards. With both sub-grade basement car parks set in a clay water table, the project was one of the first to successfully include a contiguous pile walling system.
“Placemaking projects of quality, design and value.”
Level 12, 333 Kent Street,
Sydney NSW 2000
[email protected]